Shojaei, B. ., Dashti Naserabadi, H. and Taheri Amiri, M. J. . (2024) “Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach: ”, Qubahan Academic Journal, 4(3), pp. 861–881. doi: 10.48161/qaj.v4n3a1027.